Tigh Na Mara Resort

Construction company, TS Williams Construction, approached us with a complex and difficult measurement task that couldn’t be performed using traditional methods. They needed to perform extensive renovation work on a beautiful oceanfront lodging that was heavily weathered and exposed to the elements.

Faced with unreliable drawings on the 50 suite log structure, our client asked us to provide high accuracy CAD elevations and CAD site plan. Complicating the measurement task was the heavy vegetation and cliff on the rear face of the building.

After exensive scanning of the complete exterior, we created accurate 2D CAD Elevations and CAD site plan.